Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

You can perform two quick actions for the epics listed on the left:

  1. Link an issue

  2. View epic details

There are also several quick actions you can perform for each issue by simply clicking on the three dots at the end of the row:

  1. Link: create a link to another issue

  2. Change summary: Change issue summary

  3. Time tracking: Input work log

  4. Assignee: Assign the issue to a user

  5. Transitions: Change the status of the issue

  6. Priority: Change the priority of the issue

Image Added

Image Modified

Image Removed